Recovery Obligations and Production Losses in Equipment Maintenance Agreements
- 1. Response and Restoration Deadlines
- 2. Spare Parts, Substitute Equipment and Emergency Work
- 3. Recoverable Production Losses under Korean Law
- 4. Service Credits, Damages and Liability Caps
- 5. Renewal and Evidence Review
- Frequently Asked Questions (FAQ)
- Is the fact of downtime enough?
- Can damages be claimed in addition to a service credit?
- Official Sources
Scope of service, continuity and recoverable loss
1. Response and Restoration Deadlines
A four-hour response promise may cover only acknowledgment of the fault. Define separate service levels for acknowledgment, dispatch, technician arrival, temporary recovery and final restoration. Specify whether final restoration requires an agreed throughput and acceptable defect rate under test production.
For a 24-hour factory, a Friday night outage can produce very different results under business-hour and elapsed-hour service levels. Identify the reporting channel and timestamp. Record defined pauses only when the reason, duration and notice are documented, for example while the contractor waits for the plant operator to grant access.
2. Spare Parts, Substitute Equipment and Emergency Work
List critical parts, minimum quantities, storage locations and inventory checks in a schedule. Clarify who obtains replacement equipment, bears installation and freight costs, and signs off on product quality after a workaround.
Distinguish fixed-fee services from approved extras. Agree rates and emergency approval authority. Where the contractor cannot restore the equipment, consider when the plant operator may bring in an alternative contractor and what documented costs can be claimed.
3. Recoverable Production Losses under Korean Law
Articles 390 and 393 of the Korean Civil Act address damages for nonperformance and the scope of recoverable loss. Special circumstances matter if the debtor knew or could have known of them. Document the role of the equipment in production and the consequences of downtime when agreeing the contract.
Gross lost sales, incremental outsourcing expenses and downstream customer charges are different categories. Define which direct costs are recoverable, how actual incremental costs will be documented, and whether downstream delay charges are included or subject to a separate limit. Link the incident log to outsourcing orders, expedited freight invoices and avoided costs.
4. Service Credits, Damages and Liability Caps
State whether service credits are a price adjustment, an agreed measure of loss or an exclusive remedy. Clarify whether the credit is deducted from actual damages and whether supplemental claims are allowed. Article 398 permits advance agreement on damages and allows courts to reduce an unduly excessive amount. The heading alone does not determine the character of a clause.
Select a cap that reflects actual risk. A cap based on the monthly service fee may be very different from one based on the annual contract amount. Negotiate exceptions and make sure the service schedule and liability terms do not contradict each other.
A service credit of 10% on a KRW 5 million monthly fee would amount to KRW 500,000. If additional outsourcing and freight cost KRW 7 million, the difference illustrates why the agreement must state whether the credit displaces claims for actual loss.
5. Renewal and Evidence Review
Recalculate recent incidents against the proposed service levels. Confirm technician availability, spare-part location and the ability to track start and stop times. Preserve records of notification, arrival, recovery tests and third-party expenses under a single incident number.
| Activity or term | Review point |
|---|---|
| Reporting and restoration | Notice channel, acceptance tests and weekend time |
| Substitute equipment | Critical stock, delivery and installation |
| Production losses | Outsourcing, expedited freight, delay charges and records |
| Service credits and caps | Interaction with damages, caps and exceptions |
Frequently Asked Questions (FAQ)
Is the fact of downtime enough?
Review the duty breached, the causal link to the loss and the records of incremental expenditure.
Can damages be claimed in addition to a service credit?
The answer depends on any exclusive-remedy terms and how credits interact with actual damages.